The day that we wait has come. Engineering's Day at UniKL BMI which all final year project for all student for Diploma and Degree will be analyze by accessor. Each project will analyze by 2 accessor. They will ask you all about your project. The day that knowledge is apply start from 8 am in the morning. Our accessor come at 10 am. Before that we have prepared all slide for our presentation. Our presentation held on 5th floor. After all accessor have analyze our project, we come back with happy feet.  The day end at 12 pm. At 2 pm, they will announce whose project will get top 20. Although my project didn't get top 20, I hope i can get the result with flying colours. Below are the picture on that day.














Thanks to all for supporting us while doing this final year project, especially our advisor Madam Naszariah for helping us, and to all my friends, thanks again. Below i had make a video summary for this project. Enjoy it. Thanks again : )





THE MAKING OF GATE ALARM SYSTEM




WEEK 13 - FINALIZING THE PROJECT

FINALIZING THE PROJECT

The day almost come. The project which i done almost finish. But my advisor ask me to do some video as back up if our project didn't work on Engineering Day. So my friend and i had done a video to show that our project has done. But the model can't work properly. Below are the video.





In this week also, we had done with our poster for our project. This poster we will use on Engineering Day. Below is the picture of our poster. The poster also has been approved by my advisor. By her help the poster had create. Thanks alot Madam Naszariah. : )



WEEK 12 - CONSTRUCTING MODEL FOR FYP

CONSTRUCTING MODEL FOR FYP

In week 12, i have made some model which will i use for my project.The model also aprove by my advisor. The model that i use is very simple. Below are the picture that i have taken.




WEEK 11 - CONSTRUCT AGAIN ON PCB CIRCUIT

CONSTRUCT AGAIN ON PCB CIRCUIT


In week 11, i have construct the circuit on the PCB circuit again. Meanwhile, i also have buy a box that i buy  in week 9 which i can place in the circuit in it. Below is the pictures that i have taken.












Monday 5 November 2012

WEEK 10 - SECOND TROUBLESHOOTING

SECOND TROUBLESHOOTING

In 10th week, i had done second troubleshooting on bread board. Below are the image of troubleshooting. 




















WEEK 9 - TROUBLESHOOTING

TROUBLESHOOTING

After having some problem with the main circuit, i have met with my advisor to discuss about this project. My advisor advice me to do troubleshooting and construct the circuit again on a bread board. Before this she had ask me to construct on the bread board. Because i afraid of lack of time, i didn't follow her order to so. I just skip with constructing on main circuit. Because of that, my main circuit didn't work. So i feel very regret about it. Sorry Madam Naszariah. hehe. So in week 9, i  already gone to Jalan Pasar to buy components for troubleshooting.